Scope:
This project involves the complete replacement of the existing inlet and outlet pipelines within the Gongguan Water Purification Plant premises. The new and old booster system pipelines will be interconnected to establish a robust backup system for the booster station. (Planned installation includes approximately 60 meters of ∮2000 mm pipelines, 95 meters of ∮1800 mm pipelines, 40 meters of ∮1500 mm pipelines, 90 meters of ∮1200 mm pipelines, and 50 meters of ∮900 mm pipelines. Approximately 200 meters of existing ∮900mm to ∮2000 mm pipelines will be dismantled.)
Benefits:
In coordination with the construction schedule of the Gongguan Distribution Reservoir and Integrated Multi-Use Building Complex Construction Project, this initiative will replace all existing inlet and outlet pipelines in the plant area and integrate the old and new booster system pipelines, thereby achieving redundancy and backup capacity for the booster station system.
Project Cost: USD 1.65 million
Construction Period: December 2023 – August 2025






![Taiwan.gov.tw [ open a new window]](/images/egov.png)