Scope:
1.Civil Works: Includes 1 rapid mixing basin, 8 flocculation basins, 8 sedimentation basins, 14 rapid sand filters, and 1 clean water reservoir with a capacity of 2,500 tons.
2.Mechanical and Electrical Works: Includes raw water flow meter systems, rapid mixing equipment, pre-filtration treatment machinery and devices, backwash system for the rapid sand filters, chemical dosing and chlorination system, sluice gates and water level meters for the clear water reservoir, wastewater and sludge pumps, as well as rapid filter operation and water quality monitoring systems.
Benefits:
Increases the daily water output by 500,000 CMD, raising the total output of the Zhitan Water Purification Plant from 1.5 million CMD to 2 million CMD.
Project Cost: USD 19.2 million
Construction Period: July 1993 – June 1996