Scope:
1.Connects to the reserved ∮2000mm pipeline from Phase II at the right bank floodplain at the confluence of the Keelung and Shuangxi Rivers.
2.Installs a reserved ∮1000mm pipeline on the left bank floodplain of the Keelung River.
3.Installs a reserved ∮2000mm pipeline at the Dadou Distribution Reservoir.
Benefits:
n coordination with the Ministry of the Interior Construction and Planning Agency's Danhai New Town Development Project, as well as Taipei City’s urban development plans for the Guandu Plain and Shezi Island, pipelines were laid along the floodplain of the Keelung River. This project also supports future integration with the planned Dadu Distribution Reservoir and Booster Station, as well as the Guandu Booster Station, to meet water demand from ongoing and future development projects.
Project Cost: USD 25.8 million
Construction Period: August 2012 – December 2016